Why Choose PB Builds for Your Rye Bathroom

A Recent PB Builds Project: Upstairs Bathroom in Jan Juc

The upstairs bathroom in this Jan Juc home needed a full rebuild, and the owners wanted a bath, a shower and proper storage in the one room. We started on 30 March 2026 and handed it back in early May, about six weeks from strip-out to keys.

🛁 New bath, carried upstairs A two-person lift up the stairs. We left the bath until tiling was done so it didn’t hold up other trades, then set it, levelled it and connected the waste from underneath. 

🪵 Custom vanity and tallboy VJ panel-look doors in a vinyl wrap, Blum hinges and Blum Antaro drawers. The tallboy gives the room the storage a single vanity never has.

🪨 20mm stone benchtop Templated once the cabinetry was in. We booked electrical fit-off and painting into the two to three week stone wait so the room kept moving. 

🚰 Side-mounted basin tap Set on the side wall, high enough and far enough out to clear the basin. The plumber, cabinetmaker and our site lead agreed the set-out on site before fit-off.

🪞 750mm mirrored shaving cabinet Sized to the vanity.

🚿 10mm clear toughened frameless screen Measured after tiling and fitted within a week.

🧱 New floor, waterproofing and full retile New underlay, a self-levelled floor, two-coat waterproofing, then floor tiles, wall tiles and tiled skirting.

What Changes When Your Rye Bathroom Is Upstairs

  • Deliveries are planned around the stairs, not the driveway. Heavy items like the bath and stone go in last, once there’s no risk of damage from other trades. Waterproofing matters even more, because a leak upstairs shows up in the ceiling below.

A Note for Rye Homeowners

  • If your bathroom is upstairs, ask your builder how the bath, tiles and stone are getting up there, and when. The answer tells you a lot about how well the job has been planned.

Frequently Asked Questions: Bathroom Renovations in Rye

🟢 How much does a bathroom renovation cost in Rye? Most PB Builds bathroom renovations start from around $35,000 and go up with size, finishes and access. You get a detailed quote after a site visit.

🪞 How long does an upstairs bathroom renovation take? A standard single bathroom takes about four weeks. The Jan Juc job above took about six, including the wait for the stone top.

🛁 Do you work in Rye? Yes. PB Builds works across Rye and the Mornington Peninsula, as well as greater Geelong and the Surf Coast.

🛠️ How do I get started? Call us on 0468 813 821. We’ll arrange a site visit and give you a detailed quote.

Ready to Renovate Your Rye Bathroom?

 

📞 Book a consultation and we’ll walk the stairs and the room with you before we quote.